DELAYS of up to 30 minutes are being reported on the A25 from Godstone to Nutfield delays due to roadworks.
The M25 is very slow anti-clockwise between Junction 4 (Bromley) and Junction 6 (Godstone), with travel time already 45 minutes through the roadworks.
Traffic is also slow between Junction 9 (Leatherhead) and Junction 12 (Chertsey).
Anticlockwise the M25 is slow between Junction 13 (Staines) and Junction 12 (Chertsey).
There is a good service running on Southern and South West Trains, and the trams.
There is also currently a good service on all London Underground lines.
↧